Reconstruction of boiler house with CHP burner replacement and water-tube part reconstruction.
The municipal production enterprise 'Teploenergo' in Horishni Plavni, Poltava region, Ukraine, is procuring reconstruction works for a boiler house. The scope includes replacing existing burners with combined heat and power (CHP) burners and reconstructing the water-tube part of boiler KVG-7.56 (6.5 GCal) No. 2, as well as the water-tube part of hot water boiler KVG-7.56-150 (first stage). The work is classified under construction and installation services (CPV 45454000-4). The notice is an above-threshold tender under Ukrainian law. No specific qualifications, certifications, or set-asides are mentioned. The duration or contract value is not specified.