Stormwater pipeline installation in Nelson, connecting to Stage 1.
Nelson City Council seeks a contractor for the York Terrace Stormwater Upgrade Stage 2 (SP2) physical works. The project involves installing new stormwater pipelines, manholes, and associated infrastructure from Clarence Drive, Bishopdale, along the Railway Reserve Pathway, connecting to the existing network at Manhole 5 on York Terrace (Stage 1 completed May 2026). The scope includes all necessary temporary works. This is a civil engineering and road construction contract. All communication must be via GETS Q&A. Duration and value are not specified.