Construction of footpath crossing over drainage ditch in Hampshire.
Hampshire County Council is procuring the construction of a new footpath crossing over an existing drainage ditch at Hounsome Fields. The works include ground preparation, installation of support or edging, and placement of the footpath surface to ensure safe pedestrian access. This is a call-off from Lot 1 of the Generation 5 Civil Engineering, Highways & Transportation Collaborative Framework 2024-2028. The contract is awarded under a framework agreement, indicating pre-qualified suppliers. No specific value or duration is provided.