Remove and replace two above ground storage tanks at FPC Yankton.
The Federal Prison Camp (FPC) Yankton, part of the Bureau of Prisons, is soliciting for the removal and replacement of two above ground storage tanks (ASTs). The contractor must provide all labor, materials, and equipment to remove existing tanks and install new ones in compliance with federal, state, and local regulations. The work includes site preparation, tank installation, piping, and testing. The contract is set aside for small businesses under NAICS 237120 (Oil and Gas Pipeline and Related Structures Construction). The performance period is 120 days after award. The place of performance is Yankton, South Dakota.