Pre-qualified contractors only for SH25 bridge replacement in Waikato.
The New Zealand Transport Agency (Waka Kotahi) seeks a pre-qualified contractor for the construction of a new bridge and approach works to replace the existing single-lane Ramarama Stream bridge on SH25 near Whiritoa, Waikato. The project aims to improve resilience in extreme weather on the critical Coromandel link. Works include new bridge construction, earthworks, retaining walls, stormwater improvements, utility relocations, pavements, sealing, demolition of the existing bridge, scour protection, fencing, barriers, traffic management, and landscaping. Only tenderers pre-qualified to level 'Bridge Construction – Level B (3B)' and 'Construction – Level B (4B)' under the Transport Agency's Prequalification System are eligible. The contract duration is not specified but is a physical works project.